First Article Inspection Report Package

Below are usually included in the FAIR package:

  • Identified FAI sample, most customers would accept a sample with string tag
  • (preferred) A photo showing the identified FAI sample
  • Numbered (balloon) drawing
  • FAIR Form (3 total)
  • Certificates, such as material testing certificate, post-processing certificates
  • Test report
  • Certificate of Conformance (COC)
  • Approved waiver or deviation request